關 閉

        新聞中心

        EEPW首頁 > 工控自動化 > 設計應用 > 微網分布式發電備用配置決策

        微網分布式發電備用配置決策

        作者: 時間:2012-07-23 來源:網絡 收藏

        參考文獻

        [1] 魯宗相,王彩霞,閔勇,等.微電網研究綜述[J].電力系統自動化,2007,31(19):100-107.Lu Zongxiang,Wang Caixia,Min Yong,et al.Overview on microgridresearch[J].Automation of Electric Power Systems,2007,31(19):100-107(in Chinese).

        [2] 劉楊華,吳政球,涂有慶,等.及其并網技術綜述[J].電網技術,2008,32(15):71-76.Liu Yanghua,Wu Zhengqiu,Tu Youqing,et al.A survey ondistributed generation and its networking technology[J] . PowerSystem Technology,2008,32(15):71-76(in Chinese).

        [3] 梁有偉,胡志堅,陳允平.及其在電力系統中的應用研究綜述[J].電網技術,2003,27(12):71-75,88.Liang Youwei,Hu Zhijian,Chen Yunping.A survey of distributedgeneration and its application in power system[J].Power SystemTechnology,2003,27(12):71-75,88 (in Chinese).

        [4] 羅運虎,薛禹勝,Ledwich G,等.低電價與高賠償2 種可中斷負荷的協調[J].電力系統自動化,2007,31(11):17-21.Luo Yunhu,Xue Yusheng,Ledwich G,et al.Coordination of lowprice interruptible load and high compensation interruptible load[J].Automation of Electric Power Systems,2007,31(11):17-21(inChinese).

        [5] 魏玲,楊明皓.輸配分離電力市場中含的配電公司購電模型[J].電網技術,2008,32(8):71-76.Wei Ling,Yang Minghao.A power purchase model for distributedcompany containing distributed power generation in electricity marketwith transmission separated from distribution[J] . Power SystemTechnology,2008,32(8):71-76(in Chinese).

        [6] 李海英,李渝曾,張少華.具有分布式發電和可中斷負荷選擇的配電公司能量獲取模型[J].中國電機工程學報,2008,28(10):88-93.Li Haiying,Li Yuceng,Zhang Shaohua.An energy acquisition modelfor a distribution company with distributed generation andinterruptible load options[J].Proceedings of the CSEE,2008,28(10):88-93(in Chinese).

        [7] 鄭漳華,艾芊,顧承紅,等.考慮環境因素的分布式發電多目標優化配置[J].中國電機工程學報,2009,29(13):23-28.Zheng Zhanghua,Ai Qian,Gu Chenghong,et al.Multi-objectiveallocation of distributed generation considering environmental factor[J].Proceedings of the CSEE,2009,29(13):23-28(in Chinese).

        [8] 喻潔,李揚,夏安邦.兼顧環境保護與經濟效益的發電調度分布式優化策略[J].中國電機工程學報,2009,29(16):63-68.Yu Jie,Li Yang,Xia Anbang.Distributed optimization of generationdispatch schedule considering environmental protection and economicprofits[J].Proceedings of the CSEE,2009,29(16):63-68(in Chinese).

        [9] 王建學,王錫凡,張顯.電力市場中彈性運行備用研究[J].中國電機工程學報,2005,25(18):20-27.Wang Jianxue,Wang Xifan,Zhang Xian.The flexible operatingreserve model in the power market[J].Proceedings of the CSEE,2005,25(18):20-27(in Chinese).

        [10] 王樂,余志偉,文福栓.基于機會約束規劃的最優旋轉備用容量確定[J].電網技術,2006,30(20):14-19.Wang Le , Yu Zhiwei ,Wen Fushuan . A chance-constrainedprogramming approach to determine requirement of optimal spinningreserve capacity[J].Power System Technology,2006,30(20):14-19(in Chinese).

        [11] 吳集光,劉俊勇,牛懷平,等.電力市場環境下最優備用容量的確定[J].電力系統自動化,2005,29(15):10-13.Wu Jiguang,Liu Junyong,Niu Huaiping,et al.Determination ofoptimal reserve capacity in electricity market environment[J].Automation of Electric Power Systems,2005,29(15):10-13(inChinese).

        [12] 葛炬,張粒子.可中斷負荷參與的備用市場的帕累托優化模型[J].電力系統自動化,2006,30(9):34-37.Ge Ju,Zhang Lizi.Pareto optimally model of reserve marketincluding interruptible load as participants[J].Automation of ElectricPower Systems,2006,30(9):34-37(in Chinese).

        [13] 賴業寧,薛禹勝,汪德星,等.備用容量服務市場的風險決策[J].電力系統自動化,2006,30(16):1-5.Lai Yening,Xue Yusheng,Wang Dexing,et al.Risk decision-markingfor reserve capacity market[J] . Automation of Electric PowerSystems,2006,30(16):1-5(in Chinese).

        [14] 羅運虎,邢麗冬,王勤,等.市場環境下低電價可中斷負荷的最優配置[J].電網技術,2008,32(7):72-76.Luo Yunhu,Xing Lidong,Wang Qin,et al.Optimal configuration ofinterruptible load with low price in market environment[J].PowerSystem Technology,2008,32(7):72-76(in Chinese).

        [15] 趙國波,劉天琪,李興源.分布式發電作為備用電源的優化配置[J].電力系統自動化,2009,33(1):85-89.Zhao Guobo,Liu Tianqi,Li Xingyuan.Optimal deployment ofdistributed generation as backup generators[J].Automation of ElectricPower Systems,2009,33(1):85-89(in Chinese).

        [16] 羅運虎,王冰潔,梁昕,等.電力市場環境下微電網不可再生分布式發電容量的優化配置問題[J].電力自動化設備,2010,30(8):28-36.Luo Yunhu ,Wang Bingjie , Liang Xin , et al .Configurationoptimization of non-renewable energy distributed generation capacity[J].Electric Power Automation Equipment,2010,30(8):28-36(inChinese).

        [17] 薛禹勝.暫態穩定預防控制和緊急控制的協調[J].電力系統自動化,2002,26(4):1-4.Xue Yusheng.Coordinations of preventive control and emergencycontrol for transient stability[J] .Automation of Electric PowerSystems,2002,26(4):1-4(in Chinese).

        [18] 薛禹勝.時空協調的大停電防御框架(三):各道防線內部的優化和不同防線之間的協調[J].電力系統自動化,2006,30(3):1-10.Xue Yusheng . Space-time cooperative framework for defendingblackouts part III:optimization and coordination of defense-lines[J].Automation of Electric Power Systems,2006,30(3):1-10(inChinese).

        [19] 羅運虎,邢麗冬,王勤,等.可靠性需求市場中用戶的風險決策[J].中國電機工程學報,2008,28(22):113-117.Luo Yunhu,Xing Lidong,Wang Qin,et al.Risk decision-markingfor customer in reliability demand market[J].Proceedings of theCSEE,2008,28(22):113-117(in Chinese).


        上一頁 1 2 3 4 下一頁

        關鍵詞: 分布式發電

        評論


        技術專區

        關閉
        主站蜘蛛池模板: 盘山县| 纳雍县| 上犹县| 宜昌市| 五河县| 类乌齐县| 丹寨县| 舟山市| 金平| 泉州市| 仪陇县| 扶风县| 屯昌县| 温宿县| 剑阁县| 凤冈县| 河源市| 开平市| 辽中县| 万全县| 龙里县| 姜堰市| 图们市| 陆良县| 天长市| 乃东县| 开化县| 潼南县| 图们市| 英德市| 河西区| 沙坪坝区| 定结县| 和林格尔县| 祥云县| 景谷| 临海市| 新蔡县| 滕州市| 扶沟县| 涪陵区|